Boston Scientific Cartago

Feasibility, integrated design and construction supervision for life sciences facility

Integrated Design · Construction Inspection · Consulting
Costa Rica

Boston Scientific Cartago

For this client, the firm participated in the feasibility study, conceptual planning, building shell design, tenant improvements and construction supervision for one of its largest manufacturing facilities in Costa Rica. The project included large scale cleanrooms, office areas and operational support spaces within an industrial building of approximately 538,000 sq ft (50,000 m²).

The scope required a high level of coordination across architectural, structural, mechanical and electrical disciplines, aligning the early project definition with the technical demands of a complex manufacturing environment. Through an integrated design approach, the team supported a facility planned for operational reliability, regulatory alignment and long term adaptability.

Project highlights

  • One of the largest scale projects developed by Ingenya in Costa Rica.

  • A local design partner with a strong understanding of the client’s global standards, supporting the project from concept through execution.

  • A project that reinforces Boston Scientific’s role as one of the largest employers in Costa Rica’s life sciences sector.

Feasibility, integrated design and construction supervision for life sciences facility

Boston Scientific Cartago

Project videos

Start a Technical Conversation

If your initiative involves complex industrial constraints, let's align early and discuss how to structure the engineering effort with control.

Discuss Your Initiative